The Jon Stokes Blog

The Jon Stokes Blog header image 2

AIR Set Construction

December 8th, 2009 · No Comments · AIR

The decision is to build the cave into an 8′ x 20′ container on the equipment yard. The whole set goes up in one week.

charlie-plasma-cutting
Charlie plasma-torches support beams across a six foot section of the container.

peter-metal-saw
Peter clears out the space to begin hanging aluminum mesh.  He also does a lot of math to figure out how much weight and pressure the water will exert.

peter-model-mesh
Peter drops in lumber against the welded bars, and begins hanging aluminum to shape the cave.

peter-mesh
The aluminum is screwed into the iron container, which Peter reinforces with several tons of concrete and dirt.  Then Peter fits the inside of the cave with a heavy, waterproof liner.

chuck-peter-foam
Chuck and Peter spray foaming. It is freezing cold in the mountains at night. We’re working off of Peter’s flashlight.

jon-peter-foam
11pm on Friday night.  Foam party!

jon-hands
These are my hands at my ballroom dance competition the day after spray-foaming. My poor dance partner had to hold these crusty hands.

Lesson learned: gloves.  The only way to get spray foam off your hands is sandpaper.

paint
Production Designer Michael Barton puts in three coats of paint in three tints to texture the cave walls.

paint-and-resin
Finally, a fiberglass resin layer is added to water-proof the paint. The resin is toxic so Peter and I have to wear a protective suit with an oxygen mask to apply the coat. I wish I had a picture of this - the outfit is post-apocalyptic.

cans
Spray foam, $200.  Waterproof cave, priceless.

tanks
Peter fills the cave with 1400 gallons of water off a water truck and fills two 750 gallon water tanks for standby. If you peek inside the container you can see the cave set.

Tags:

No Comments so far ↓

There are no comments yet...Kick things off by filling out the form below.

Leave a Comment